
Add to Cart
BA NO.4 Stainless Steel Sheet Plate 316L Hot Rolled 201 Stainless Steel Plate
What is No 4 finish on stainless steel?
Stainless steel with a No. 4 finish is attained by mechanically polishing the metal with fine abrasives belts to remove minimal amounts of metal from the surface. The resulting appearance has short, parallel lines for a linear effect.
Is stainless steel sheet hot rolled or cold rolled?
Metals like titanium, aluminum, and nickel alloys, along with stainless steel can all be cold rolled. Though cold rolling metals such as stainless steel coil increases the strength of the metal and its surface finish, it does decrease the ductility.
What is hot rolled steel used for?
Hot rolled products like hot rolled steel bars are used in the welding and construction trades to make railroad tracks and I-beams, for example. Hot rolled steel is used in situations where precise shapes and tolerances are not required.
Product Description
Hairline Finish Plate | Mirror Finish Plate |
Patterned Finish Sheet | 2B Finish Sheet |
No.4 Finish Sheet | Embossed Finish Sheet |
No. 8 Finish Sheet | Brushed Finish Sheet |
No. 2B – Matte finish | No.8 – Mirror finish |
No. 4 – Brushed finish | 2R (Bright Annealed) Finish |
Polished Finishes | Mirror Polished |
Grade | C | Si | Mn | P | S | Ni | Cr | Mo |
201 | ≤0.15 | ≤0.75 | 5.5-7.5 | ≤0.06 | ≤ 0.03 | 3.5-5.5 | 16.0-18.0 |
- |
301 | ≤0.15 | ≤1.0 | ≤2.0 | ≤0.045 | ≤ 0.03 | 6.0-8.0 | 16.0-18.0 |
- |
304 | ≤0.08 | ≤1.0 | ≤2.0 | ≤0.045 | ≤ 0.03 | 8.0-10.5 | 18.0-20.0 | -
|
304L | ≤0.03 | ≤1.0 | ≤2.0 | ≤0.035 | ≤ 0.03 | 9.0-13.0 | 18.0-20.0 |
- |
316 | ≤0.08 | ≤1.0 | ≤2.0 | ≤0.045 | ≤ 0.03 | 10.0-14.0 | 16.0-18.0 | 2.0-3.0
|
316L | ≤0.03 | ≤1.0 | ≤2.0 | ≤0.045 | ≤ 0.03 | 12.0-15.0 | 16 .0-1 8.0 | 2.0-3.0 |
321 | ≤0.08 | ≤1.0 | ≤2.0 | ≤0.035 | ≤ 0.03 | 9.013 | 17.0-1 9.0 |
- |
410 | ≤0.15 | ≤1.0 | ≤1.0 | ≤0.035 | ≤ 0.03 | - | 11.5-13.5 |
- |
430 | ≤0.12 | ≤0.75 | ≤1.0 | ≤0.040 | ≤ 0.03 | ≤0.60 | 16.0-18.0 |
- |
Company Introduce
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;for products need new production for common materials,usually make shipments in 7-10 days; for products need special and rare materials,usually need 15-20 days to make shipment.